Construction

Projects

Liping Khola Hydorpower project

16.26 MW Sidhupalchwok
developer: Himriver power ltd.

  • Project Specification: 132 kv
  • Project Length: 15 KMs
  • Project Status: ONGOING(60%)

Liping Khola Hydorpower project

16.26 MW Sidhupalchwok
developer: Himriver power ltd.

  • Project Specification: 132 kv
  • Project Length: 15 KMs
  • Project Status: ONGOING(60%)

Liping- bhotekoshi-upperchaku-jurimbahubsub-station

132 kv/220 kv Sindhupalchwok

  • Project Specification: 132 kv/220kv
  • Project Status: ONGOING(20%)

Yambaling Khola Hydropower

7 MW Sidhupalchwok
developer: Yambaling Hydropower ltd.

  • Project Specification: 33 KV
  • Project Length: 7 KMs
  • Project Status: COMPLETED

singati lamosangu project

Dolakha
sub-contacted: Eib pvt ltd

  • Project Specification: 132 KV
  • Project Length: 20 KMs of 42 kms
  • Project Status: COMPLETED

lower likhu hydropower project

28mw ramechhap
developer: SwetGanga HCL

  • Project Specification: 132 KV
  • Project Length: Swetganga – New Khimti 23 KMs
  • Project Status: COMPLETED

Bardaghat - Sardi double circuit line

Nawalparasi
Sub-contracted through: mudbhary & joshi costruction

  • Project Specification: 132 KV
  • Project Length: 20 KMs
  • Project Status: COMPLETED

Our Work

Iculis posuere proident vero quaerat exercitation!

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Corporis suscipit gravida quisquam ultrices omnis et dolorem.

Our Ongoing Projects

Neque aliquet

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Vestibulum eveniet

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.